References

DOSTO

product detail picture

Arriva/BeNEX/Ostdeutsche Eisenbahn GmbH ODEG

Following lengthy negotiations, at the end of December 2009 BeNEX, Arriva and Stadler Pankow signed a contract for the supply of vehicles for the “Netz Stadtbahn” transport tender in a deal worth approximately EUR 146 million.

The order is for the supply of 16 four-carriage DOSTO type electric double-decker multiple-unit trains, 1 single-carriage Regio-Shuttle RS1 type diesel motor coach and 6 two-carriage GTW 2/6 type diesel motor coaches.

The Berlin-Brandenburg transport network (VBB) awarded contracts for transport services on the commuter railway network in mid-2009. The order was broken down into 4 batches, and ODEG won the contracts for batches 2 and 4.

ODEG – Ostdeutsche Eisenbahn GmbH will commence operations on the Berlin-Brandenburg commuter railway network with the ordered trains, i.e. routes RE 2, RE 4, RB 35, RB 33 and RB 51, in phases.

The Regio-Shuttle RS1 and GTW 2/6 type vehicles will commence operation with the 2011 timetable change, whilst the double-decker multiple-unit trains will enter service in 2012.


Vehicle Detail

DOSTO

more factsheets of this vehicle

Swiss Federal Railways (SBB) S-Bahn Zurich, Switzerland
download PDF
(Deutsch)
(English)
(Français)
(Italiano)
Westbahn Management GmbH, Wien, Austria
download PDF
(Deutsch)
BLS AG, Berne, Switzerland
download PDF
(Deutsch)
(English)
(Polski)